Ski Resort News
09/08/2021
With the construction of the "Hochzeiger 2.5" eight-person chairlift, the Hochzeiger Bergbahnen are continuing the quality offensive they have started and are focusing specifically on functionality, comfort and safety.
After more than 32 years of service, the Rotmoosbahn quad chairlift was dismantled at the end of the 2020/21 winter season. Instead of the Rotmoosbahn, the new "Hochzeiger 2.5" eight-person chairlift will be in operation from winter 2021/22. Construction of the new, state-of-the-art ropeway began in summer 2020. The second phase of construction work will take place in summer 2021.
Functionality meets design
The new, ultra-modern eight-person chairlift has weather protection hoods, heated comfort seats and locked locking bars. The route runs spectacularly in the direction of Hochzeiger. The mountain station can be reached at almost 2,500 meters in just 4:46 minutes. Here - at the highest reachable point of the Hochzeiger ski area - there is an impressive view of the ski area and the Pitztal mountains and from here more than 80% of the slopes in the ski area can be reached.

Hochzeiger 2.5 facts, figures & location
- 1,991 m height of the valley station 2,492 m height of the mountain station
- 1,296 m inclined runway length
- 15 supports
- 4:46 minutes driving time
- 5.5 m / sec. driving speed
- 3,200 people transported per hour
Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026